Various types of cemented carbide thread tap from Japanese supplier
Since its founding in 1923, YAMAWA has contributed to Japan's manufacturing industry
as a top brand name in cutting tools and is now a globally-known brand.
With its theme of "reliable screw threads," YAMAWA continues to offer
threaded manufacturing tools of the highest quality,
including taps (cutting taps and helical cutters), dies, center drills, specialized tools, and more.
Our company, since its founding, has offered YAMAWA products to customers in Japan as well.
New product system basic concept diagrams by steel.
New product listing, steel blind hole tap.
New product listing Steel through-hole tap
Get the most out of your tap with a combination of a high-dimension finishing machine and
high-precision tooling!!
Made with super-tough ultra-fine particle cemented carbide for superior abrasion resistance.
Also known as a rolled (thread) tap or cold forming tap.
With no blade, it creates threaded holes without creating dust.
The Standard tap series includes a lineup of three different forms of tap:
The "HT" (Hand Tap), the "SP" (Spiral Tap) and the "PO" (Point Tap).
The Plus series includes two types of tap:
The "+SP," a cutting tap cor creating blind holes based on the shape of the hole,
and the "+PO," a through-hole cutting tap.
Specialized machining cutting tap for manual or drill-machine use.
YAMAWA Group will continue to provide the highest quality.
"Reliable screw threads" is YAMAWA's theme.
YAMAWA is certified in ISO 9001 (Quality Management Systems) and
ISO 14001 (Environmental Management Systems).
In addition, as the first tap maker in Japan to acquire ISO 9001 certification,
we hope to continue to be an enterprise based on high standards of product management and
heartfelt care for the environment.
With rich physical distribution abilities, we are able to swiftly respond to a wide variety of situations.
September 1987: Started deliveries of reserve supply to Baoshan Steel Works (Baosteel) in
Shanghai, China (support given in Chinese).
May 1999: Started deliveries of reserve supply to Ansteel (support given in Chinese). |
Delivery Time
After payment /confirm/iation, if the item is in stock it will be shipped the same day at the earliest and two days later at the latest.